Print this page

Sewage plan of Kharman sookhteh village (Qazvin province)


The first and second

Stage design studies

 

1392

Year studies

1420

The operation of the scheme

9086

The population (people)

135

The maximum daily rate (lit / sec)

 15

Length (km)

200-250

Diameter (mm)

Corrugated

Gender Tube

 150

Area (ha)


Published in Wastewater

263 comments