Print this page

Sewage plan of Mashhad ardehal village (Esfahan province)


The first and second

Stage design studies

 

1391

Year studies

1420

The operation of the scheme

5537

The population (people)

26

The maximum daily rate (lit / sec)

 60

Length (km)

200-315

Diameter (mm)

Corrugated

Gender Tube

 220

Area (ha)


Published in Wastewater

5832 comments