Print this page

Sewage plan of Mehraban city


The first and second

Stage design studies

 

1390

Year studies

1420

The operation of the scheme

8946

The population (people)

53

The maximum daily rate (lit / sec)

 26

Length (km)

200-400

Diameter (mm)

Polyethylene 

Gender Tube

207

Area (ha)


Published in Wastewater

2015 comments