Print this page

The plan of Water carriage to Parand (Alghadir 2) from Razi abad Tank to 40000 m3 Tank


BOT

Stage design studies

 

1392

Year studies

1425

The operation of the scheme

700000

The population (people)

2300

The maximum daily rate (lit / sec)

 37

Length (km)

1400

Diameter (mm)

Ductile

Gender Tube

1

The number of pump stations


Published in Water supply

452 comments