The first and second |
Stage design studies |
|
1392 |
Year studies |
|
1425 |
The operation of the scheme |
|
1000000 |
The population (people) |
|
2300 |
The maximum daily rate (lit / sec) |
|
150 |
Length (km) |
|
1000-2300 |
Diameter (mm) |
|
Steel |
Gender Tube |
|
4 |
The number of pump stations |