The first ,second and third |
Stage design studies |
|
1389 |
Year studies |
|
1394 |
The operation of the scheme |
|
60000 |
The population (people) |
|
250 |
The maximum daily rate (lit / sec) |
|
140 |
Length (km) |
|
160-450 |
Diameter (mm) |
|
|
|
Gender Tube |
|
8 |
The number of pump stations |