The first and second |
Stage design studies |
|
1391 |
Year studies |
|
1420 |
The operation of the scheme |
|
16252 |
The population (people) |
|
53.17 |
The maximum daily rate (lit / sec) |
|
82 |
Length (km) |
|
200-250 |
Diameter (mm) |
|
Polyethylene |
Gender Tube |
|
5 |
The number of pump stations |