The first |
Stage design studies |
|
1395 |
Year studies |
|
1420 |
The operation of the scheme |
|
10638 |
The population (people) |
|
40 |
The maximum daily rate (lit / sec) |
|
56 |
Length (km) |
|
63-315 |
Diameter (mm) |
|
Polyethylene |
Gender Tube |
|
1 |
The number of pump stations |