Print this page

The plan of Wastewater Treatment Plant for Kharvana city


The first and second

Stage design studies

 

1389

Year studies

1420

The operation of the scheme

3869

The population people

8.8

Pacity lit / sec

 Desalination RO

Treatment process

Extended aeration with

nitrogen removal capability 

The plant site area ha

 2

Further Details


Published in Water Treatment

227 comments