The first and second |
Stage design studies |
|
1389 |
Year studies |
|
1420 |
The operation of the scheme |
|
3869 |
The population people |
|
8.8 |
Pacity lit / sec |
|
Desalination RO |
Treatment process |
|
Extended aeration withnitrogen removal capability |
The plant site area ha |
|
2 |
Further Details |


