Print this page

Sewage plan of Kaboodar ahang city


The first and second

Stage design studies

 

1388

Year studies

 

The operation of the scheme

 

The population (people)

55.5

The maximum daily rate (lit / sec)

 5.5

Length (km)

315

Diameter (mm)

Polyethylene 

Gender Tube

 

Area (ha)


Published in Wastewater

738 comments