Sewage plan of Kaboodar ahang city


The first and second

Stage design studies

 

1388

Year studies

 

The operation of the scheme

 

The population (people)

55.5

The maximum daily rate (lit / sec)

 5.5

Length (km)

315

Diameter (mm)

Polyethylene 

Gender Tube

 

Area (ha)


Published in Wastewater

799 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.