Print this page

The plan of Surface waters collection and Transmission for 8 industrial town of Tehran province


The first and second

Stage design studies

 

1388

Year studies

1420

The operation of the scheme

4600

The population (people)

 

The maximum daily rate (lit / sec)

 530

Length (km)

63-600

Diameter (mm)

Concrete-Stony

Gender Tube

 

The number of pump stations


Published in Water supply

1655 comments