The first and second |
Stage design studies |
|
1388 |
Year studies |
|
1420 |
The operation of the scheme |
|
4600 |
The population (people) |
|
The maximum daily rate (lit / sec) |
||
530 |
Length (km) |
|
63-600 |
Diameter (mm) |
|
Concrete-Stony |
Gender Tube |
|
The number of pump stations |


