Sewage plan of 10 priority villages of Hossein abad Kalpoosh area (Semnan province)


The first and second

Stage design studies

 

1392

Year studies

1420

The operation of the scheme

8315

The population (people)

15

The maximum daily rate (lit / sec)

 50

Length km

200

Diameter mm

Corrugated

Gender Tube

 615

Area ha


Published in Wastewater

2763 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.