Sewage plan of 4 priority villages of Ilam province


The first and second

Stage design studies

 

1392

Year studies

1420

The operation of the scheme

9679

The population (people)

36

The maximum daily rate (lit / sec)

40

Length (km)

110-200

Diameter (mm)

Corrugated

Gender Tube

 17

Area (ha)


Published in Wastewater

19463 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.