The first and second |
Stage design studies |
|
1392 |
Year studies |
|
1425 |
The operation of the scheme |
|
3171 |
The population people |
|
140 |
Pacity lit / sec |
|
Desalination RO |
Treatment process |
|
The plant site area ha |
||
|
Further Details |