The plan of Classification Wastewater Treatment Plant for Ahar village (Tehran province)


The first and second

Stage design studies

 

1392

Year studies

1425

The operation of the scheme

3171

The population people

140

Pacity lit / sec

 Desalination RO

Treatment process

 

The plant site area ha

 

Further Details


Published in Water Treatment

998 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.