The first and second |
Stage design studies |
|
1392 |
Year studies |
|
1420 |
The operation of the scheme |
|
2.984.205 |
The population people |
|
518.09 |
Pacity lit / sec |
|
Activated sludge |
Treatment process |
|
24 |
The plant site area ha |
|
|
|
Further Details |


