Sewage plan of Iran Khodro company


The first and second

Stage design studies

 

1385

Year studies

1420

The operation of the scheme

30000

The population (people)

163

The maximum daily rate (lit / sec)

 

Length (km)

200-500

Diameter (mm)

Polyethylene 

Gender Tube

 

Area (ha)


Published in Wastewater

823 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.