Sewage plan of Ghare aghaj city


The first and second

Stage design studies

 

1388

Year studies

1425

The operation of the scheme

15202

The population (people)

82

The maximum daily rate (lit / sec)

 25

Length (km)

200-400

Diameter (mm)

Polyethylene 

Gender Tube

92

Area (ha)


Published in Wastewater

899 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.