The first and second |
Stage design studies |
|
1390 |
Year studies |
|
1420 |
The operation of the scheme |
|
172763 |
The population (people) |
|
The maximum daily rate (lit / sec) |
||
220 |
Length (km) |
|
200-900 |
Diameter (mm) |
|
Polyethylene |
Gender Tube |
|
2087 |
Area (ha) |


