Sewage plan of Zanjan province


The first and second

Stage design studies

 

1392

Year studies

1425

The operation of the scheme

3171

The population (people)

19

The maximum daily rate (lit / sec)

 13.4

Length (km)

200-250

Diameter (mm)

Polyethylene 

Gender Tube

 

Area (ha)


Published in Wastewater

4623 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.