The first and second |
Stage design studies |
|
1386 |
Year studies |
|
1390 |
The operation of the scheme |
|
8000 |
The population (people) |
|
60 |
The maximum daily rate (lit / sec) |
|
25 |
Length (km) |
|
63-250 |
Diameter (mm) |
|
Polyethylene |
Gender Tube |
|
1 |
The number of pump stations |


