The first and second |
Stage design studies |
|
1388 |
Year studies |
|
1392 |
The operation of the scheme |
|
45000 |
The population (people) |
|
250 |
The maximum daily rate (lit / sec) |
|
86 |
Length (km) |
|
200-400 |
Diameter (mm) |
|
Polyethylene |
Gender Tube |
|
3 |
The number of pump stations |


