The first and second |
Stage design studies |
|
1395 |
Year studies |
|
1425 |
The operation of the scheme |
|
25.000 |
The population (people) |
|
57 |
The maximum daily rate (lit / sec) |
|
150 |
Length (km) |
|
200 |
Diameter (mm) |
|
Polyethylene |
Gender Tube |
|
2 |
The number of pump stations |


