The first and second |
Stage design studies |
|
1392 |
Year studies |
|
1425 |
The operation of the scheme |
|
40000 |
The population (people) |
|
|
|
The maximum daily rate (lit / sec) |
|
Length (km) |
||
Diameter (mm) |
||
Gender Tube |
||
The number of pump stations |


