The first and second |
Stage design studies |
|
1390 |
Year studies |
|
1425 |
The operation of the scheme |
|
220000 |
The population (people) |
|
750 |
The maximum daily rate (lit / sec) |
|
560 |
Length (km) |
|
63-600 |
Diameter (mm) |
|
Polyethylene-Ductile |
Gender Tube |
|
6 |
The number of pump stations |


